Peoples State Bank New Waukon Branch

Client

Peoples State Bank

Location

Peoples State Bank

Size

5,134 SF Main Level & 2,833 SF Second-Story New Construction

Completion Date

Anticipated Completion Spring of 2026

Project Overview

HSR provided architectural design services for the new Peoples State Bank Waukon branch. This new 2-story branch will provide a welcoming open lobby, drive thru, offices, conference/training room and staff support spaces. An elevator makes the second level fully accessible. The second level training/conference room allows for additional flexibility of the space with a separate rear entrance.

Project Gallery